Real-time scheduling, driven by a live sim

Simulate the floor.
Schedule it live.

Line group A · Press to QAin sync

Simulate the floor

A live simulation runs your plant forward and surfaces the bottleneck the instant it forms.

Train the scheduler

The live sim trains the AI on your plant’s real behavior — setups, tooling, labor, due dates — not assumptions.

Schedule it live

The AI re-solves in real time — rebalancing load, batching setups, rerouting around bottlenecks. Seconds, not an overnight batch.

The factory OS

The factory OS. A live simulation of your floor, and a real-time AI scheduler that runs straight off it.

See how it works
Layer 01 — Live simulation · reads constraints
Simulation

How it works

A plan that keeps up with the floor.

  1. Makespan builds a live model of your plant — every station, conveyor, setup and shift. Run it forward and the bottleneck shows itself before it costs you a shift.

  2. No spreadsheet of assumptions. The scheduler learns setups, tooling, labor and due dates straight from the running simulation — so it solves against the plant you actually have, and re-learns the moment it changes.

  3. The AI re-sequences every job around the live constraints and keeps the plan in sync as the floor moves — a machine drops, an order jumps the queue, the plan keeps up. Seconds, not overnight.

One model

One model. Simulation and scheduling, together.

Most tools simulate in one place and schedule in another, then fight the drift between them. Makespan runs both off a single live model — the simulation is the basis the AI schedules from.

Interactive demo

makespan0h

PRESS
WELD
PAINT

Drag a job and the makespan recomputes live.

Drag a job, or move it with the arrow keys.

  1. 01

    Real-time scheduling

    A machine drops or an order shifts and the plan re-solves in seconds. The floor never waits on an overnight run.

  2. 02

    Scheduled from a live sim

    The part nobody else does: the AI schedules directly off a running simulation of your floor — real constraints, not assumptions.

  3. 03

    Best UX

    A control room your planners actually want to open. Drag a job and the makespan recomputes live.

Supported by

  • Austria Wirtschaftsservice (aws)
  • NVIDIA Inception Program
Blog

Notes from the factory floor — how we build the solver and what we learn from the plants we schedule.

Blog

· By Julian Rath

Most factory simulation is optimised for the wrong thing

Why I care less about a beautiful 3D robot demo than about simulation fast enough to train, benchmark, and validate real scheduling decisions!

On the order of

106

Speed-up we measured in a real high-bay warehouse setup, compared with the conventional simulation workflow previously used in that context.

The dispatch

Notes from the factory floor.

How we build the solver, what we learn from the plants we schedule, and the occasional deep dive on makespan. Roughly monthly. No fluff.

No spam. Unsubscribe anytime.